Capacities and inventory for Dump, Stockpile and Staged Stockpile nodes require a capacity (mass) to enable PO to find a feasible solution should the material flow be constrained by any process node production rates. Dumps and Stockpiles can use any principal field that has a Sum Aggregation type as the accumulation field of the Capacity.
When first setting up the material flow it is recommended to set the capacities to a large value to ensure the schedule is feasible. After the schedule runs successfully, adjust the capacities down to realistic levels.
Inventory reconciliation points are used to set the status (quantities and qualities) of dumps and stockpiles at the beginning of the schedule. The reconciliation point date must be on or before the schedule start date-time.
Reconciliation points can be created manually or sourced from a Data Feed In.
For Staged Stockpile inventory see Pile Inventory.
 to add or inspect reconciliation points.
 to add or inspect reconciliation points.
 to add a new reconciliation point. Any existing points (manual or from a Data Feed In) will be shown in a list on the left from newest to oldest by measure date.
 to add a new reconciliation point. Any existing points (manual or from a Data Feed In) will be shown in a list on the left from newest to oldest by measure date.Dumps with imported dump solids do not support inventory records, the inventory is taken from the sum of dump solid volume.
Reconciliation point entries from a Data Feed In source are appended with (Data Feed In) and are read only. Data Feed In types are available for Dumps, Stockpiles (Staged and standard) and LIFO Stockpiles.
For details on Data Feed In configuration see Data Feed In.
Entries in the inventory panel appear under the following headings.
Manual checkpoints take precedence over Data Feed In checkpoints if they have the same measure date.
| Item | Description | 
|---|---|
| Measured Date | The date the reconciliation point is valid from. | 
| Estimated volume fill rate | (Optional ) The volume fill rate in units/hr from the measured date to the schedule start date. The inventory will be adjusted at this rate up to the schedule start. | 
| Estimated mass fill rate | (Optional ) The mass fill rate in units/hr from the measured date to the schedule start date. The inventory will be adjusted at this rate up to the schedule start. | 
| Value | The assigned reconciliation point value for each principal field. 
 The values are not editable if the reconciliation point came from a Data Feed In. | 
| Item | Description | 
|---|---|
| Measured Date | The date the reconciliation point is valid from. | 
| Pile Name | The pile name. | 
| Parcel Index | The parcel index, must be unique. | 
| Parcel Name | The parcel name. | 
| Mass | The parcel mass. | 
| Volume | The parcel volume. | 
| Density | The parcel density. | 
| [Principal Field] | The assigned reconciliation point value for each principal field. 
 The values are not editable if the reconciliation point came from a Data Feed In. |